AAAC Bare Aluminum Alloy Conductor 6201-T81 Overhead Use
AAAC Bare Aluminum Alloy Conductor 6201-T81 Overhead Use image
Bare AAAC conductor all aluminum alloy conductor 6201-T81 Alliance(7/4.77mm) Overhead use
APPLICATION
AAAC is mainly used as bare overhead transmission cable and as primary and secondary distribution cable. It is also suitable for laying across basins, rivers and valleys where special geographical teatures exist.
These conductors are usually in occasions where AAC conductors do not provide the required strength and ACSR conductors are not required or suitable. Applications range from extra high voltage (EHV) transmission lines to sub-service spans at distribution or utilization voltages on private premises.
CONSTRUCTION
Bare aluminum alloy conductors made of 6201 Aluminum alloy are wrapped helically around a central wire.
ASTM B-398: Aluminum Alloy 6201-T81 aluminum alloy conductors
ASTM B-399: Concentric Lay stranded 6201-T81 aluminum alloy conductors
ELECTRICAL PROPERTIES
density@20ºC | 2.70 kg/dm |
Temperature Coefficient@20°C | 0.00360 (°C) |
resistivity@20°C | 0.0326 Ohms mm2/m |
linear Expansivity | 23 x10-6 (°C) |
SERVICE CONDITIONS
Ambient Temperature | -5°C – 50°C |
Wind Pressure | 80 – 130kg/m |
Seismic Acceleration | 0.12 – 0.05g |
Isokeraunic level | 10 – 18 |
relative Humidity | 5 – 100% |
Bare AAAC conductor all aluminum alloy conductor 6201-T81 Alliance(7/4.77mm) Overhead use technical data
Code Name | Total Area | Stranding | Conductor Nominal diameter |
Nominal Weight | Rated Strength | Max DC resistance at 20 oC |
|
AWG or MCM | mm2 | No / mm | mm | kg/km | kN | Ω /km | |
Akron | 30.58 | 15.52 | 7 x 1.68 | 5.04 | 43 | 4.92 | 2.1588 |
Alton | 48.69 | 24.71 | 7 x 2.12 | 6.36 | 68 | 7.83 | 1.3557 |
Ames | 77.47 | 39.19 | 7 x 2.67 | 8.01 | 108 | 12.42 | 0.8547 |
Azusa | 123.3 | 62.44 | 7 x 3.37 | 10.11 | 171 | 18.88 | 0.5365 |
Anaheim | 155.4 | 78.55 | 7 x 3.78 | 11.34 | 216 | 23.75 | 0.4264 |
Amherst | 195.7 | 99.30 | 7 x 4.25 | 12.75 | 272 | 30.03 | 0.3373 |
Alliance | 246.9 | 125.10 | 7 x 4.77 | 14.31 | 343 | 37.83 | 0.2678 |
Butte | 312.8 | 158.60 | 19 x 3.26 | 16.30 | 435 | 46.46 | 0.2112 |
Canton | 394.5 | 199.90 | 19 x 3.66 | 18.30 | 548 | 58.56 | 0.1676 |
Cairo | 465.4 | 236.40 | 19 x 3.98 | 19.90 | 649 | 69.25 | 0.1417 |
Darien | 559.5 | 283.57 | 19 x 4.36 | 21.80 | 778 | 83.10 | 0.1181 |
Elgin | 652.6 | 331.00 | 19 x 4.71 | 23.55 | 908 | 96.98 | 0.1012 |
Flint | 740.8 | 374.50 | 37 x 3.59 | 25.13 | 1028 | 107.36 | 0.0894 |
Greeley | 927.2 | 469.60 | 37 x 4.02 | 28.14 | 1289 | 134.62 | 0.0713 |
Bare AAAC conductor all aluminum alloy conductor 6201-T81 Alliance(7/4.77mm) Overhead use test equipment
Why you choose us?
- Products comply with GB, IEC, BS, ASTM, DIN, VDE and JIS standards; Customer standard requirments Accepted;
- Certified to ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007;
- Registered capital of $30 million and factory covers an area of 60,000㎡;
- Advanced test equipment and procedures, 100% inspection before factory;
- Enough stocks and the higest efficient shipping time guarranteed;
Zhenglan Cable Technology CO., Ltd.,formerly known as HENAN Zhengzhou Cable Co., Ltd., is one of the large scale backbone enterprises in China's wire and cable industry. The company's registered capital is about 4 million 6 thousand yuan and its headquarter is located in 49 floor of the South Tower of the Greenland Center of Zhengzhou high railway station (Petronas Twin Towers). The factory is located in the Zhengzhou cable science and Technology Industrial Park of the Wuzhi industrial area. It is a modern industrial park integrating advanced research and development technology and production technology.
FAQ
Is your company a factory or a trade company?
Factory, more than 20 years in China
How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~7 days. You can use your own express account or prepay us if you do not have an account.
What are your payment terms?
We normally accept T/T 30% deposit, 70% balance before delivery as the main payment terms, and other payment can also be negotiated. Trade assurance on Alibaba is also available.
What’s the delivery time?
Sample order needs 3~5 days. Formal order depends on the quantity. Usually it needs 7-30 days after get your payment.
What is your MOQ?
Generally it is 5000m.
We are China AAAC Bare Aluminum Alloy Conductor 6201-T81 Overhead Use manufacture and supplier,You can get more details with Email,you will get cheap price or factory price.
Tags: AAAC Bare Aluminum Alloy Conductor, Bare Aluminum Alloy 6201-T81 Conductor, Bare Aluminum Conductor, Overhead Use Bare Aluminum Conductor